General Introduction
Do Son Industrial Park Hai Phong is located in the Southeast of Hai Phong city, in Ngoc Xuyen Ward, Do Son District. This is a joint venture project between Asia Glorious Development Limited (Hong Kong) and the Hai Phong People's Committee, represented by Hai Phong Infrastructure Construction and Development Company, with a total area of 150 hectares – Phase I (of which 100 hectares is the Industrial Park and 50 hectares is the high-tech zone). The total investment capital is 75 million USD, with a legal capital of 25 million USD, of which the foreign side contributes 70% and the Vietnamese side contributes 30%. Do Son Industrial Park Hai Phong is the only industrial park with Hong Kong investment in Northern Vietnam.
Priority sectors for investment attraction in Do Son Industrial Park Hai Phong include electronic equipment; marine biological engineering products; tourism; technology, fine arts, cosmetics, and sports equipment; pharmaceuticals, traditional medicine, and medical machinery; food, clean food, seafood, and refined agricultural products; machinery for agriculture, construction, and industry; packaging printing, interior and exterior decoration, etc. Do Son Industrial Park particularly prioritizes and encourages projects in high-tech, green, and clean industries.
Overview Information
- Name: Do Son Industrial Park Hai Phong
- Investor: Do Son Hai Phong Industrial Park Joint Venture Company, Hai Phong Infrastructure Construction and Development Company, Asia Glorious Development Limited (Hong Kong),
- Scale: 150 ha (100 ha for Industrial Park, 50 ha for high-tech zone)
- Available area:
- Rental price: 80-100 USD
- Industries attracting investment: Science and technology, electronics, mechanics, material production, information technology, etc.

Geographic location and transportation
Do Son Industrial Park has a convenient geographic location and transportation for travel and goods transport: It takes only 90 minutes to drive from Do Son Industrial Park Hai Phong to Hanoi via Highway 5. The distance from Do Son Industrial Park to Hai Phong container port is only 17km via this highway.
With 125 km of coastline and over 40 wharves, including deep-water ports capable of handling vessels from 10,000 DWT to 20,000 DWT at full capacity, sea transport is highly developed. Hai Phong Port is one of the growth drivers of the Northern Key Economic Zone.
There are daily domestic flights from Hai Phong to Ho Chi Minh City, Da Nang, Nha Trang, Buon Ma Thuot, Phu Quoc Island, and Da Lat. Cat Bi Airport has been upgraded to an International Airport with international flights to South Korea, Thailand, and soon China (Guangzhou, Shenzhen), Japan, Singapore, Malaysia, etc.
Distance from Do Son Industrial Park to locations:
- 190 km from Mong Cai border gate
- 120 km from Hanoi Capital
- 17 km from Hai Phong container port
- 12 km from Hai Phong airport
- 16 km from Hai Phong city center
- 14 km from Hai Phong railway station
- 3 km from Do Son Resort Hai Phong
Infrastructure and utilities
Do Son Industrial Park in Hai Phong has synchronous and modern infrastructure, meeting the technical infrastructure needs of enterprises in the park in a timely and complete manner:
- The internal road system in the Industrial Park is paved with concrete, complying with the Vietnamese H30 traffic road standard. The main axis road is 34m wide, and the secondary axis road is 21.5m wide.
- Power supply system: A 110KV high-voltage substation and a dedicated 22KV line serve the electricity needs of enterprises in the park.
- Clean water supply system: Supplied by the Do Son Water Plant, with quality meeting the TC505/BYT standard of the Ministry of Health, with a capacity of 10,000m3 per day.
- Wastewater treatment system: Wastewater in the park is treated through the Industrial Park's wastewater treatment plant meeting international standards, with a capacity of 1,200m3/day and night.
- Modern telecommunications system, providing full postal and telecommunications services.
- Solid waste treatment: Hai Phong City will provide domestic and industrial waste collection services after the waste has been treated by each enterprise.
- Wastewater drainage system: Uses ¢400 centrifugal reinforced concrete pipes leading from enterprises to the Industrial Park's wastewater treatment plant, where it is treated before being discharged into the city's wastewater drainage system.
- Rainwater drainage system uses reinforced concrete box culverts with a width of 1m and a slope of i = 3%, connected to the city's rainwater drainage system.
- Fire prevention and fighting system is arranged along the main roads of the Industrial Park.
- Roadside greenery system ensures a green and clean Industrial Park.
- Modern telecommunications system, providing full postal and telecommunications services.
- Bank transaction branches and automated teller machines (ATM) located in the Industrial Park provide banking and credit services, helping enterprises quickly and conveniently handle liquidity and salary payments for staff and employees...
Investors participating in Do Son Industrial Park
With a very favorable geographical location and transportation, synchronously invested infrastructure, and attractive investment incentive policies, Do Son Industrial Park has attracted many reputable domestic and foreign investors, especially investors from South Korea, Hong Kong, Taiwan, Singapore...
To date, Do Son Industrial Park has attracted about 35 enterprises to lease land and factory buildings for investment with a total investment capital of over 340 million USD. Most enterprises have advanced production lines, clean technology, low environmental pollution, and no toxic factories. Enterprises in Do Son Industrial Park provide jobs for over 6,000 workers.
Operating duration and investment costs at Do Son Industrial Park
Project duration:
- 50 years from the date of issuance of the investment certificate
- Investors can lease long-term or transfer and invest
- During the lease period, investors can sublease or transfer to other small investors
Investment costs:
- Rental price including infrastructure: 80-100 USD/m2
- Electricity price: peak hours are 0.1 USD/kWh; normal hours are 0.05 USD/kWh; off-peak hours are 0.03 USD/kWh.
- Water price: 0.4 USD/m3
- Labor cost: with a reference price of 200-500 USD/person/month, depending on the job position
- Management fee: 0.5 USD/m2/year
- Wastewater treatment fee: 0.3 USD/m3
Special incentives at Nomura Industrial Park
Regarding taxes:
- Corporate income tax (Decree No. 218/2013/ND-CP): Exemption from corporate income tax for 2 years and a 50% reduction in tax payable for the next 4 years when investors invest in the industrial park.
- VAT exemption: For enterprises granted an investment certificate as an Export Processing Enterprise (EP).
Land rent (Decree No. 46/2014/ND-CP)
- Projects using land to build housing for workers in industrial parks according to projects approved by competent authorities.
- Land for building common infrastructure in industrial parks, industrial clusters, and export processing zones according to the planning approved by competent authorities as stipulated in Clause 2, Article 149 of the Land Law.
Regarding investment incentive sectors: (Decree No. 118/2015/ND-CP on the list of investment incentive sectors)
- Sectors with special investment incentives: High technology, information technology, supporting industries.
- Sectors with investment incentives: Science and technology, electronics, mechanics, material production, information technology.
Legal procedures: one-stop-shop administrative procedures, very convenient and fast for investors.












