Tien Son Industrial Park – Bac Ninh was established under Decision No. 1129/QD-TTg dated December 18, 1998, of the Prime Minister. The industrial park was invested and built by the Vietnam National Glass and Ceramics Corporation (VIGLACERA) of the Ministry of Construction. With an initial total area of 349 ha and a total investment capital of up to 834.3 billion VND. Tien Son Industrial Park was approved according to the Detailed Planning and has been adjusted and expanded many times. Currently, the industrial park has an area of 332.05 ha, located in Dong Nguyen, Hoan Son, Noi Due, Tuong Giang communes, Tien Son district (now Tu Son town), Bac Ninh province.
![]()
This is one of the important industrial parks of Bac Ninh province, attracting many domestic and foreign enterprises to invest and develop production and business. Tien Son Industrial Park is built with modern standards, with technical infrastructure, services, and transportation meeting the production and business needs of enterprises. Tien Son Industrial Park has an operating period of 50 years from the date of the investment decision. Currently, Tien Son Industrial Park has been contributing positively to economic development. In addition, it also creates jobs and income for local people and contributes to the development of Bac Ninh province.
Strategic location
Tien Son Industrial Park – Bac Ninh has a strategic location in connecting goods in the Northern region of Vietnam, located on the Hanoi – Quang Ninh route and about 30km southeast of the center of Hanoi capital. Besides, this industrial park is about 35km from Noi Bai airport; about 100km from Hai Phong seaport; about 120km from Cai Lan deep-water seaport (Ha Long City). This is a great advantage for transporting goods and connecting with other provinces and industrial parks more easily.
In addition, Tien Son Industrial Park is also connected to arterial roads such as National Highway 18, National Highway 1A, Hanoi – Hai Phong expressway, and other important routes, making travel and goods transportation more convenient.
Overall assessment shows that Tien Son Industrial Park has a favorable location for regional connectivity. It creates momentum for regional development and provides convenient access to major markets.
Infrastructure
Tien Son Industrial Park is invested with synchronous infrastructure. From electricity and water sources to waste treatment... ensuring standards for all activities to take place smoothly.
- Tien Son Bac Ninh Industrial Park has an electricity system supplied from the national power grid through a 110/22kV transformer station, with a total capacity of 2 x 40MVA.
- Water source: Supplied from groundwater sources, with a filling capacity of 30,000m3/day and night. In phase 1, the project to build a groundwater station at Tien Son Bac Ninh Industrial Park has a capacity of 6,500m3/day, and phase 2 is expected to continue building 1-2 more stations with equivalent capacity.
- Telecommunications system: Modern, international standard and diverse, including data transmission services, internet, IP phone or video conferencing, etc.
- Waste treatment system: Collected and treated at a common wastewater station using microbiological methods.
Above is the useful information that we provide to readers about Tien Son Industrial Park.












