Home / Industrial Park / Yen My II Industrial Park – Hung Yen

Yen My II Industrial Park – Hung Yen

hailongjsc|22/01/2025

General Introduction

Yen My II Industrial Park was approved for addition to the master plan of industrial parks in Hung Yen province until 2020 with a scale of 190 hectares, located within the administrative boundaries of Yen My town, Yen My district, Hung Yen province.
On September 12, 2018, the Prime Minister approved the adjustment to reduce the planned area of Yen My II Industrial Park from 190 hectares to 97.5 hectares per Official Dispatch No. 1199/TTg-CN. Subsequently, Yen My II Industrial Park was approved for expansion under Official Dispatch No. 1837/TTg-CN dated December 25, 2020, with an approved expansion area of 216 hectares located within the administrative boundaries of Trung Hung commune, Trung Hoa commune, and Yen My town, Yen My district. Thus, the total area of Yen My II Industrial Park, including the expansion according to the plan, is 313.5 hectares.
On May 27, 2022, the expansion of Yen My II Industrial Park was officially approved for investment policy by the Government under Decision No. 650/QD-TTg, with the investor for the construction and infrastructure business project of Yen My II Industrial Park being Hoa Phat Hung Yen Industrial Park Infrastructure Development Co., Ltd.

Overview Information

  • Name: Yen My II Industrial Park – Hung Yen
  • Scale: 313.5 ha
  • Occupancy rate: 31%
  • Investor: Hoa Phat Hung Yen Industrial Park Infrastructure Development Co., Ltd.
  • Infrastructure usage fee: 130 USD/m2. Price excludes VAT
  • Industries attracting investment: environmentally friendly investment sectors such as electronics assembly, automotive and motorcycle mechanics, steel production, steel products, pharmaceuticals, etc.

Geographical Location

Yen My II Industrial Park has a favorable location, adjacent to National Highway 39, which is a route connecting two important traffic axes: the Hanoi – Hai Phong Expressway and National Highway 5, and:
+ 30 km from the center of Hanoi city
+ 50 km from Noi Bai International Airport
+ 75 km from Hai Phong Port
In addition, the easy traffic connection makes it extremely convenient to travel from Yen My II Industrial Park to important economic centers such as Bac Ninh, Hai Duong, Hai Phong, Bac Giang, and Ha Nam.

Yen My II Industrial Park – Hung Yen

Infrastructure system at Yen My II Industrial Park – Hung Yen

  • Power supply system: Production power in Yen My II Industrial Park is guaranteed to be supplied by a 110kV/22kV substation with a capacity of 63 MVA, supplied from the national power grid.
  • Water supply system: Yen My II Industrial Park has invested in building an internal water supply system with a designed capacity of 7,500 m3/day and night. At the same time, water supply pipelines are pre-connected to each land plot in the industrial park.
  • Wastewater treatment system: The internal wastewater treatment system has a maximum treatment capacity of 6,000 m3/day and night, capable of treating wastewater from column B to column A according to Vietnam's environmental technical standards.
  • Internal traffic system: The main roads in Yen My II Industrial Park are designed with a width of 50 m, and branch roads have a width of 23.5 m.
  • Fire protection system: Firefighting water systems and fire hydrants are arranged along the traffic routes in the industrial park to ensure quick response to fire incidents within the industrial park.
  • Communication system: The telecommunications and communication system is guaranteed to be ready and connected according to the needs of investors operating in the industrial park.
  • Other utilities: Besides technical infrastructure works, Yen My II Industrial Park reserves 13% of the planned area to build landscape and green infrastructure to maintain environmental friendliness and an airy space for the industrial park.

Current status of investment attraction

Currently, for the existing area of 97.5 ha, the entire area has been leased and filled to 100% with typical projects such as: The beverage factory of Tribeco Northern Co., Ltd.; The glass door manufacturing factory of Austdoor Hung Yen One Member Co., Ltd., the pharmaceutical production project of Napharco Pharmaceutical Co., Ltd... and a series of projects by domestic and foreign investors.
For the expanded planned area, the investor is currently urgently implementing compensation and site clearance work and expects to deploy infrastructure construction from the end of 2022.

Investment Costs

Infrastructure rental fee (land rental price): 130 USD/m2/until the end of the industrial park's operation term. (Rental price may change depending on the location and scale of the leased land plot)
Infrastructure management and maintenance fee: 13,800 VND/m2/year (equivalent to 0.57 USD/m2/year)
Annual land use fee: According to the regulations of the Hung Yen Provincial People's Committee, depending on the time.
Wastewater treatment fee: 11,000 VND/m3 (equivalent to 0.46 USD/m3)
Power supply price: Applied according to EVN's production power supply price.
Water supply price: 13,000 VND/m3 (equivalent to 0.55 USD/m3)
Note: The above costs may be changed from time to time without prior notice.

Incentives when investing in Yen My II Industrial Park – Hung Yen

Investment incentives at Yen My II Industrial Park:
Investors operating in Yen My II Industrial Park enjoy investment incentive policies including:
– Exemption from import tax on goods to create fixed assets
– Corporate income tax: Exemption from tax for 02 years and a 50% reduction in tax payable for the next 04 years for new investment projects in the industrial park.

Tags

  • #HaiLongJSC

Related articles

Nam Cau Kien Industrial Park
hailongjsc-20/06/2024

Nam Cau Kien Industrial Park

Tien Son Industrial Park – Bac Ninh
hailongjsc-03/06/2024

Tien Son Industrial Park – Bac Ninh

Phu Ha Industrial Park – Phu Tho
hailongjsc-09/05/2024

Phu Ha Industrial Park – Phu Tho

Most viewed

PROCEDURES AND METHODS FOR ERECTION AND CONSTRUCTION OF INDUSTRIAL FACTORY STEEL STRUCTURES
hailongjsc-26/10/2021

PROCEDURES AND METHODS FOR ERECTION AND CONSTRUCTION OF INDUSTRIAL FACTORY STEEL STRUCTURES

WHAT IS STEEL STRUCTURE? COMPREHENSIVE KNOWLEDGE ABOUT STEEL STRUCTURES
hailongjsc-09/03/2021

WHAT IS STEEL STRUCTURE? COMPREHENSIVE KNOWLEDGE ABOUT STEEL STRUCTURES

REGULATIONS ON FACTORY CONSTRUCTION YOU MUST KNOW IN 2025
hailongjsc-28/08/2025

REGULATIONS ON FACTORY CONSTRUCTION YOU MUST KNOW IN 2025

WHAT IS CONSTRUCTION STRUCTURE?
hailongjsc-09/12/2021

WHAT IS CONSTRUCTION STRUCTURE?

CONSTRUCTION METHODS – CONSTRUCTION WORKS
hailongjsc-25/02/2025

CONSTRUCTION METHODS – CONSTRUCTION WORKS

Information

CONTACT

Hai Long Steel Structure Factory

Quyet Thang Commune, Hai Phong City, Vietnam

Headquarters

8th Floor, Taiyo Building, 97 Bach Dang, Hong Bang Ward, Hai Phong City, Vietnam

Contact Us

Hotline: 084 6625 888

Switchboard: 0225.3669.899

Email: info@hailongjsc.vn

  • facebook
  • youtube
  • linkedin

@1999 HaiLongJSC. All rights reserved.

footer image