Anticipating the new wave of FDI, industrial parks in Hai Phong are developing strongly, and the scale of projects is constantly expanding. In parallel, there is an push to accelerate the construction of factories and workshops to meet the production needs of businesses in a timely manner.
However, building a factory or production workshop is not just about putting up walls and roofs. It is a complex process that requires meticulousness, from planning to design and implementation, and finding reasonable and standard design solutions is not easy.
These were also the difficulties faced by Mr. Wang Zi Jun – representative of the Investor, Sirtec International Vietnam Co., Ltd. in realizing his ideas and dreams for a factory to be built in Deep C Industrial Park – Hai Phong.
Overcoming hundreds of construction companies and intense bidding processes, Hai Long Construction caught the “eye” of Mr. Wang Zi Jun and officially embarked on a challenging and promising journey, working together to draw up the design that would define the success of the Sirtec International Vietnam Factory project.
ABOUT THE SIRTEC INTERNATIONAL VIETNAM FACTORY PROJECT
The “Sirtec International Vietnam Factory” project is located in Deep C Industrial Park – an ideal destination for high-quality investment projects, at the intersection of the two largest growing industrial centers in the North: Hai Phong and Quang Ninh. The investor is Sirtec International Vietnam Co., Ltd. – one of the leading reputable companies specializing in plastic injection molding and electronic components in Taiwan.
This is a large-scale project with an area of over 57,000 m2 and a total investment of nearly 15 million USD. The project places special emphasis on quality, large-scale architecture, and complex structures, along with the simultaneous construction and installation of multiple items, which requires strict control over transportation and site organization. Receiving the trust of the Investor, Hai Long Construction was honored to be selected as the design consultant and general contractor for the project.
| LAND AREA | 58,000 m² |
| CONSTRUCTION AREA | 34,500 m² |
| TOTAL INVESTMENT | 15 MILLION USD |
| TOTAL SAFE WORKING HOURS | 3,066,000 HOURS |
DIFFICULTIES IN THE EARLY DAYS
Recalling the days of 2021, when Covid was the obsession of every business. From the very first steps of the project, unexpected challenges were encountered, from finding a suitable investment location to carrying out legal procedures for investment licensing. Due to pandemic isolation, the Investor could not directly visit Vietnam for surveys, so they trusted Hai Long Construction to handle all legal aspects.
Not letting the partner down, Hai Long Construction proactively built a connection system between the investor and the industrial park management board, helping the investor quickly find the most suitable location for their needs and supporting project licensing. In addition, the seamless coordination between the office in Vietnam and the customer service department in Taiwan helped the investment consulting phase proceed smoothly, saving time and costs, and increasing the project's chances of success.
Despite facing the difficulties of remote communication and limited face-to-face meetings, with all discussion plans having to take place through the screens of online meetings, the Hai Long Construction team has never stopped working hard and diligently. Because even a "slight error" in the design can lead to a "huge mistake" in reality, we – the design engineers – always have to prioritize accuracy in our work, ensuring that every detail during the design process of the Sirtec International Vietnam Factory Project is discussed and clearly understood.

DESIGN ENGINEERS WITH PASSION IN EVERY STROKE
Starting every design project is always the beginning of an inspiring and dedicated journey. With specialized skills and many years of experience in the industry, the Design Consulting Center always advises investors on the best solutions to save costs as well as ensure technical and aesthetic standards, bringing maximum efficiency to each project.
As soon as they received the "brief" from the partner, the team of design engineers at Hai Long Construction immediately started to draw a "picture" full of effort and dedication. Starting with design consulting for the Investor, to balance the partner's ideas and the factory structure, we needed to listen to every detail to clearly understand the customer's needs, desires, and style. This helped us create unique and creative design ideas, simulating the design through 2D and 3D drawings.

We are dedicated and pay attention to every small detail, from material selection to design plans. Design is the prerequisite for smooth, favorable, and effective construction. Every detail will be specified on each drawing and can be adjusted according to the Investor's wishes.
And step by step, a "million-dollar" drawing for the Sirtec International Vietnam Factory was officially born. The factory buildings are characterized by uniform blocks, expressing solidity and comprehensiveness. The green space on the factory campus is also an impressive highlight with plants planted methodically and with aesthetic intent. It is not only a work of technical art but also the result of the consensus and tireless efforts of the entire design consulting team from Hai Long Construction.


A completed drawing will be realized by construction engineers into a perfect work. After more than 500 days of implementation in two phases, the project was handed over on the committed schedule. This is the clearest proof of the efforts and team spirit of Hai Long Construction.
At the project handover ceremony, Mr. Vuong Tu Quan could not hide his surprise when he first set foot in the factory and shared his thoughts: “The Sirtec Factory project was a direct idea that I proposed. Standing here, not only do I feel pride and honor, but I also want to thank Hai Long Construction for successfully realizing my dream. The most valuable thing in this project is collaborating with an elite partner like Hai Long Construction, and I believe this project will help Hai Long Construction's reputation grow even further.”

With persistence and tireless efforts, the design consulting center of Hai Long Construction has created a new success story, not only satisfying the Investor but also increasing the company's prestige and reputation, once again proving that when there is unity and maximum effort, and when you put your "heart" into every project, nothing is impossible.