Trang Due 3 Industrial Park is an industrial park project with a scale of over 650 hectares in the Southwest of Hai Phong, extending the Trang Due Industrial Park chain – where LG's production complex is concentrated. The project was approved for investment policy by the Prime Minister in 2025, started construction in May 2025, and is expected to become a new destination for FDI capital in electronics and high technology in the North.
The article updates in 2026 on the location, scale, infrastructure, progress, and the first investors at Trang Due 3 Industrial Park.
1. Overview of Trang Due 3 Industrial Park
| Location | An Truong commune and An Lao commune, Hai Phong city (formerly belonging to Truong Tho, Truong Thanh, An Tien, Bat Trang communes, An Lao district) |
| Developer | Saigon – Hai Phong Industrial Park Joint Stock Company |
| Area | Approximately 652.73 hectares |
| Total investment | Approximately 8,094 billion VND (investor's contributed capital is about 1,220 billion VND) |
| Legal status | Decision approving the investment policy No. 86/QD-TTg dated 14/01/2025 of the Prime Minister |
| Groundbreaking | 11/5/2025 |
| Orientation | Multi-industry industrial park, prioritizing high technology, electronics, components, and sustainable development |

2. Location and connectivity
- About 10 km from the center of Hai Phong; about 14 km from Cat Bi airport.
- About 8 km from Hanoi – Hai Phong expressway; about 100 km from the center of Hanoi, and 90 km from Noi Bai airport.
- Approximately 25 km from Hai Phong port, with convenient access to the Lach Huyen deep-water port.
- Adjacent to Trang Due 1 and 2 Industrial Parks (approx. 1.5 km) – benefiting from the existing supply chain of Korean electronics corporations.
3. Technical infrastructure according to design
- Internal traffic: main axis 32 m (6 lanes), branch roads 23 m.
- Electricity: 110/22 kV substation with a capacity of 2 × 63 MVA.
- Clean water: approximately 32,100 m³/day and night.
- Wastewater treatment: approximately 19,200 m³/day and night.
- Worker housing: Seoul Ecohome area (approx. 9,000 accommodations) located about 1.5 km away; new housing projects are being planned in the vicinity.
4. First investors
At the groundbreaking ceremony (May 11, 2025), the developer signed memoranda of understanding for land lease with the following enterprises:
| Enterprise | Area | Sector |
|---|---|---|
| Sao Hoa National JSC | Approximately 10 ha | Ready-built factory for lease |
| Horn Vietnam Co., Ltd. | 9 ha | Headphone assembly |
| IDIS Vietnam Co., Ltd. | 5.5 ha | Smart energy storage and distribution equipment |
| Halla Electronics Vina Co., Ltd. | 5 ha | Automotive components |
Hai Phong has been one of the leading localities in the country in attracting FDI in recent years; therefore, clean industrial land with synchronized infrastructure like Trang Due 3 is expected to have a fast occupancy rate upon handover.
5. Investment incentives
Projects in Trang Due 3 Industrial Park may be eligible for corporate income tax incentives as regulated (4-year tax exemption, 50% reduction for the next 9 years for eligible projects), along with incentives on land rent based on location and industry. Investors should work directly with the developer and the Hai Phong Economic Zone Management Board to determine specific incentive levels.
Data compiled from information published by the developer, the Hai Phong Economic Zone Management Board, and the press; subject to change according to project progress.
6. Frequently Asked Questions
Where is Trang Due 3 Industrial Park located?
In An Truong commune and An Lao commune, Hai Phong City (formerly An Lao district), about 10 km from the city center.
Who is the developer of Trang Due 3 Industrial Park?
Saigon – Hai Phong Industrial Park Corporation.
When is land available for lease?
The project broke ground in May 2025 and land is handed over in phases; some investors have already signed memoranda of understanding for land lease. Contact the developer for information on available land plots.
Build your factory at Trang Due 3 with Hai Long Construction
The Hai Long Steel Structure Factory is located in Tien Lang, Hai Phong – very close to Trang Due 3 Industrial Park, helping to shorten transportation and installation time and reduce costs for investors. As a general contractor for construction and steel structures ranked in the Top 500 Vietnamese enterprises, Hai Long Construction has completed over 500 factory and workshop projects for FDI enterprises.
Contact for design – construction consultation: 0846 625 888 · info@hailongjsc.vn · Send quote request.