The quality control and product management process for steel structure products at the Hai Long Steel Structure Factory is always carried out according to international standards. With over 20 years of experience in construction, manufacturing, and steel structure erection, we always ensure our commitment to customers regarding high-quality products and timely completion. In this article, we will share the steel structure quality control process at the Hai Long factory.
Standards for steel structure product quality control
Product quality control is a crucial activity in the steel structure manufacturing process at the Hai Long Steel Structure Factory. Therefore, we always apply quality control standards based on both Vietnamese and international standards, which are improved and supplemented through practical production, while also referencing and learning from other factories in the steel structure industry.

Quality control based on daily operational inspection principles
Every stage at the factory is strictly inspected by our quality control team, conducted by specialized engineers with practical training and QC professionals holding certificates issued by competent authorities.
The quality control measures applied by Hai Long include: Dye penetrant inspection, magnetic particle inspection, and ultrasonic testing.

– 100% Inspection: For finishing stages: Welding, painting, packaging.
Inspection measures and tools: Tape measures, calipers, visual inspection, gauges, dry film thickness gauges, weld height gauges (specified by batch).
– Probability inspection: Ultrasonic, magnetic, penetrant, measurement, visual inspection. Performed on all semi-finished and finished products.
– Tools and equipment for inspection and acceptance: Periodically calibrated by competent authorities according to regulations:
- Various tape measures
- Micrometers
- Calipers
- Scales
- Weld height gauges
- Various gauges
- Ultrasonic testing equipment
- Materials for penetrant and magnetic testing
- Wet film thickness gauges
- Surface profile comparison samples after shot blasting
- Dry film thickness gauges
Fabrication drawings, material requirements, and painting/plating standards
– X-ray inspection of welds (upon special customer request)
Product quality inspection process
Materials: Main and auxiliary materials are inspected 100% or by probability upon warehouse entry, based on bills of lading, intended use, and material standards.
Before being released for production, materials are inspected, accepted, sampled, and tested by the customer at a competent testing agency according to regulations.
After the inspection and acceptance process mentioned above, all materials are put into use once they have been verified, analyzed, tested, and meet specific quality requirements.


Cutting inspection: Performed by the producer (self-inspection) and stage QC staff (probability inspection).
Inspection method: Actual measurement, visual observation (deformation), recording and storing inspection results, and submitting reports to the Factory Director (in case of serious non-conformity).
Strict inspection is to ensure quality and prevent mass non-conforming semi-finished products.

Assembly and welding inspection:
– Assembly inspection: Based on fabrication drawings, using tapes and gauges for inspection.
For rough assembly: Mainly self-inspection (100%), QC performs probability inspection to avoid mass errors and severe deformation.
Inspection tools: Gauges, angle squares, tape measures.
For precision assembly: Inspection is performed (100% self-inspection and QC inspection, with special emphasis on identifying: reference surfaces, reference points, and reference lines).
Usage: Gauges, tapes, and calipers for inspection based on fabrication drawings.
– Welding inspection: By visual inspection, weld height gauges, and templates (to detect post-weld deformation).
Rough welding: Visual inspection and weld height measurement.
Precision welding: Visual inspection, weld height measurement, and probability-based penetrant, ultrasonic, and magnetic testing.
Mark and specify the detected defects for the production department and request a timeline for rectification.

Cleaning, painting, and deformation inspection
- Cleaning inspection: By visual inspection and comparison samples.

- Fine grinding inspection: By visual inspection.
- Deformation inspection: By visual inspection and measuring tape.
Painting inspection: By visual inspection; Wet film thickness gauge; Dry film thickness gauge.



Packaging inspection: By visual inspection.
Warranty procedure, common defects, and rectification methods
Common defects and rectification methods: