GawNP Nam Dinh Vu Industrial Center is one of the largest factory building construction projects that Hai Long Construction has undertaken as a general contractor: 170,000 m² of land, 105,050 m² of construction floor area at Nam Dinh Vu Industrial Park, Hai Phong.

Project information
| Category | Information |
| Projects | GawNP Nam Dinh Vu Industrial Center |
| Developer | GawNP Capital |
| Location | Nam Dinh Vu Industrial Park, Hai Phong |
| Land area | 170,000 m² |
| Construction floor area | 105,050 m² |
| Scope of work | General construction contractor, design consultancy, steel structure manufacturing and installation |
| Year of execution | 2023 |
The investor's challenge
GawNP Capital is developing an industrial center in one of the key industrial parks near the Hai Phong port system. With a scale of over 10 hectares of construction floor area, the project sets three main requirements:
- Schedule: early handover to put the facility into operation.
- Large-scale synchronization: many items are under construction simultaneously but must adhere to unified quality standards.
- A single point of responsibility: the investor needs a general contractor with sufficient capacity from design to construction instead of managing many individual contractors.
Hai Long's solution
Optimal design from the start
Hai Long's design consultancy center implements the design according to the D&B model, calculating structural plans based on actual production and construction capabilities.
See more articles: What is the D&B (Design & Build) model?
Proactive steel structure manufacturing
Steel structures are fabricated at Hai Long's factory in parallel with foundation construction, helping to ensure supply and installation progress.
Synchronized construction organization
A centralized management model with clear task chains, internal safety and supervision boards at the construction site, ensuring that items are implemented in parallel while maintaining unified quality according to ISO 9001, ISO 14001, and ISO 45001 systems.

Results
- Commenced and handed over in 2023 with a total floor area of 105,050 m².
- Contributed to Hai Long's highest 2023 revenue in the 2019–2023 period.
- Continued to be trusted by GawNP Capital as the general contractor for the GawNP Dong Van III Industrial Center (Ninh Binh) with 160,000 m² of land and 99,846 m² of floor area.

Lessons from the project
- Design and construction by the same entity ensures practical plans and minimizes modifications during construction.
- In-house steel structure factory is the decisive factor for progress in projects exceeding 100,000 m² of floor area.
- Centralized management maintains consistent quality when multiple construction fronts run in parallel.
Implement your factory building project with Hai Long Construction
Are you planning to build a factory in Hai Phong or northern provinces? Contact Hai Long Construction for consultation and a quote.
- Hotline: (+84) 846 625 888