Project progress update for GNP Nam Dinh Vu on May 4, 2023. The project has a total value of over 700 billion VND, covers an area of 170,000m2, and consists of one warehouse, 6 factory buildings, and one administration building. The project will be completed in July 2023.


The factory buildings are currently in the construction phase as follows:
Factory Building No. 2, with an area of 2 hectares, is currently undergoing steel reinforcement installation in preparation for concrete floor pouring.

Factory Building No. 3 is currently leveling the base stone layer for the foundation; the steel structure, purlins, and roof have been completed in preparation for metal roof sheeting, with safety nets installed to ensure the safety of workers during installation.


Factory Building No. 4 has been compacted, the foundation is basically finished, and the metal roof has been installed; the concrete floor is covered with a tight nylon layer to retain moisture, ensuring the highest quality for the concrete.

The team of engineers and workers is working tirelessly, day and night, to complete the factory buildings, ensuring the schedule committed by the general contractor Hai Long Construction to the investor, as well as ensuring the quality of the project.