Factory construction according to the correct process is an indispensable step to owning a factory facility that meets technical standards and safety regulations. Below is the detailed information provided by Hai Long Construction to help businesses build quickly and up to standard.
1. Factory design process
1.1. Survey and Construction Planning
- Site survey: The construction unit will inspect the terrain and site to propose a suitable design plan.
- Design planning: Architects and technicians will analyze and propose technological solutions and technical infrastructure, ensuring the construction process is reasonable, saving time and costs.
- All design plans are reviewed and optimized to ensure:
- Compliance with environmental regulations of the State, industrial park, or industrial cluster where the project is implemented.
- Meeting fire safety standards, protecting the facility and users comprehensively.
- Finally, the technical team will analyze the local geology to propose the most suitable foundation structure. At the same time, key construction standards and codes will be strictly applied, ensuring stability and long-term durability for the factory.
With a methodical design process, businesses will own a factory that meets all technical standards and long-term usage efficiency.

1.2. Preliminary drawing design
After surveying and proposing construction plans, the team of architects and engineers will concretize ideas through detailed drawings, including the entire master plan, the layout of each item, and 3D perspectives of the project. These drawings help the investor easily visualize and grasp the project accurately after completion.
Depending on the production sector, technological lines, and the scale of each factory, the layout design will vary. The drawings need to clearly show construction items in the project such as construction density, construction boundaries, internal road systems, green space density, etc. Besides, drawings related to fire protection systems and emergency exit systems also need to be focused on to ensure safety and compliance with regulations.

1.3. Detailed drawings and construction cost estimation
The preliminary drawing is the basis for the investor and the construction unit to discuss and agree on the final construction plan. Then, the team of engineers and architects will complete the detailed construction drawings.
At this stage, the drawings will specifically describe all construction items, including:
- Architectural structural details.
- Foundation structure plan.
- Drawings of pre-engineered steel buildings and connection nodes.
- Material specifications.
- M&E drawings (electrical, water, mechanical).
- Fire protection and emergency exit systems.
Detailed items include:
- Production workshop area.
- Warehouse.
- Office area.
- Dining hall, canteen, rest area for staff and workers.
- Underground tank.
- Electrical substation.
- Parking area, guard house.
- Gate, fence system.
At the same time, the investor needs to carry out procedures for construction permits and fire protection. On the contractor's side, the team will prepare a construction budget, detailing each task and specific volume for each item.
The documentation, including construction drawings and cost estimates, will serve as the basis for project acceptance and determining the volume of completed work later on.
2. Factory building construction process
After completing the design, the contractor will implement the factory building construction steps.
2.1. Receiving and storing construction materials
Before starting construction, the contractor must receive materials ensuring the correct quantity and quality as required in the estimate. For example: steel, metal roofing, bricks, cement, etc. Since the volume of materials needed is very large, there may be inconsistencies in quantity and type, especially with small details like bolts and screws.
Thorough inspection upon receiving materials is mandatory. At the same time, the contractor needs to ensure that materials are transported to the warehouse and stored carefully to avoid damage, wear, or rust before use.
Degraded material quality not only causes waste but also directly affects the quality of the project. Therefore, material storage and management must be strictly implemented to ensure construction progress and quality.

2.2. Factory floor construction
Factory floor construction is an essential step in the construction process, as the foundation directly affects the stability of the entire project. Below are the implementation steps:
Step 1: Site leveling
Depending on the current state of the ground at the construction site, the contractor will proceed with leveling to create a stable surface for subsequent stages.
Step 2: Axis positioning
Axis positioning is an extremely important task, accurately determining the location of column foundations based on design drawings. This is the basis for the accurate construction of the entire project.
Step 3: Excavating fence foundations
With a large area, the factory needs a solid fence system. Excavating fence foundations requires ensuring depth and a sturdy structure to withstand long-term use.
Step 4: Constructing foundations and tie beams
Foundations and tie beams are executed based on the determined axis positions. Factory foundations are usually made of reinforced concrete, with single footing or pile foundation designs depending on the load and soil conditions.
Step 5: Soil compaction
After completing the foundations, the ground is leveled and compacted to achieve the density required by the technical specifications in the design drawings, ensuring good load-bearing capacity.
Step 6: Stone base compaction for the factory
The stone base layer is spread evenly and compacted to achieve the density and thickness according to design standards, creating a solid cushion for the concrete floor.
Step 7: Factory floor construction
Upon completing the above steps, the contractor proceeds to install reinforcement and pour the factory floor concrete, ensuring durability and high load-bearing capacity.
The above process must be strictly followed to ensure the quality and progress of the project.
2.3. Factory steel structure construction
The steel structure is considered the backbone of the factory, playing a crucial role in ensuring the stability and load-bearing capacity of the entire project. This is one of the most important stages in the factory construction process.

Requirements for steel structure construction
- Stability: The steel structure must be installed according to technical standards to ensure load-bearing capacity and durability throughout its service life.
- Accuracy: The accuracy of steel structure installation directly affects subsequent construction items such as roofs, walls, and other factory systems.
- Safety assurance: The construction process must strictly comply with labor safety regulations.
Tools for supporting steel structure installation
To increase accuracy and reduce installation time, contractors use modern measuring equipment such as:
- Theodolite: Helps measure and accurately position steel components.
- Laser level: Used to align angles, heights, and ensure components are installed in a straight line.
- Cranes or lifting equipment: Used to move and install large and heavy steel beams.
Steel structure erection process
- Steel component preparation:
- Inspect the quality of steel components before installation.
- Ensure components are precisely fabricated, free from warping or rust.
- Main steel column installation:
- Begin by positioning and securing the main steel columns onto the completed foundations.
- Check the verticality and ensure secure connections between columns and foundations.
- Beam and purlin installation:
- Install horizontal beams and purlins according to design drawings, ensuring a robust load-bearing structure.
- Use high-strength bolts to ensure secure connections between components.
- Inspection and adjustment:
- After installation, inspect the entire steel frame for stability, positional accuracy, and alignment.
- Adjust any non-compliant points to ensure quality standards.
Steel frame construction must be performed by a professional and experienced technical team to ensure project schedule and quality.
2.4. Factory building roof construction
After completing the steel frame assembly, the factory roof construction process begins. This is a critical step to ensure the factory provides effective shelter, load-bearing capacity, and durability under all weather conditions.
Requirements for roof construction
- High precision: The first roofing sheet must be aligned accurately as it serves as the reference point for subsequent sheets.
- Aesthetics: Joints between roofing sheets must be aligned to create a neat and uniform roof surface.
- Waterproofing: Installation of roofing sheets must ensure there are no gaps or areas prone to water leakage, providing effective roof waterproofing.
Roof construction process
- Preparation of roofing sheets and tools:
- Inspect the quality of roofing sheets, ensuring they are free from warping, rust, or scratches.
- Prepare necessary tools such as drills, self-drilling screws, and safety equipment.
- Installation of the first roofing sheet:
- Determine and secure the position of the first roofing sheet.
- Ensure the sheet is installed straight, perpendicular to the purlins, and in accordance with design drawings.
- Installation of subsequent roofing sheets:
- Subsequent sheets are overlapped at the joints, ensuring the overlap line remains straight.
- Use self-drilling screws to securely fasten the roofing sheets to the purlins.
- Inspection and adjustment:
- Inspect the entire roof to ensure sheets are installed correctly with no gaps.
- Adjust joints to ensure aesthetics and waterproofing capabilities.
- Roof finishing:
- Install accessories such as gutters and downspouts to complete the factory roof drainage system.
- Ensure the roof has excellent load-bearing capacity and high durability.
Notes for roof construction
- Ensure worker safety when working at heights using protective equipment such as safety harnesses, hard hats, and non-slip footwear.
- Select roofing materials suitable for the climate conditions and the factory's operational requirements.
Proper technical execution of roof construction not only ensures project quality but also extends the lifespan of the factory.
2.5. Construction of surrounding walls and interior partitions for the factory
The surrounding walls and internal partitions of a factory building play a crucial role in protecting the structure from external elements such as wind, dust, rain, and environmental impacts. Materials commonly used for factory walls and partitions may include corrugated metal, brick, or other fire-resistant and insulating materials. This stage must be executed meticulously to ensure stability, safety, and alignment with the factory's architectural design.
Construction process for factory walls and internal partitions:
- Material preparation and inspection:
- Select appropriate wall materials such as corrugated metal, brick, or fire-resistant and insulating materials (e.g., Smartboard panels, Gywall plasterboards).
- Inspect the quality of materials to ensure they are free of defects, especially for fire-resistant materials.
- Construction of walls and partitions:
- External walls: Construct the surrounding walls of the factory using the selected materials. The walls must ensure safety against external factors such as wind, fire, and dust.
- Internal factory partitions: These partitions can be made of fire-resistant and insulating materials to ensure durability and safety throughout their service life. Partitions may define rooms, production areas, or storage zones.
- Installation of doors, windows, and ventilation louvers:
- After constructing the partitions and walls, the construction team will proceed to install doors, windows, and ventilation louvers to ensure proper ventilation and ease of movement within the factory.
- Doors must be selected with the correct dimensions and types suitable for design requirements, with fire, wind, and dust resistance as needed.
- Inspection and finishing:
- After completing the construction of walls and partitions, the technical team must re-inspect critical points such as tightened bolts, joints between material panels (corrugated metal, brick, plasterboard), and gaps at door openings.
- This inspection helps ensure there are no water leaks and that the structures remain watertight during rain.
Notes for factory wall and partition construction:
- Fire safety: Using fire-resistant materials for partitions and walls is essential to ensure safety in the event of a fire incident.
- Wind and dust protection: Especially for factories with production areas, selecting materials and constructing walls without gaps helps minimize dust and wind infiltration into the production zone.
- Door installation technique: Door installation must comply with safety standards and technical designs, ensuring airtightness and good protection for the facility.
The construction of walls and partitions is a critical step in the factory building process, ensuring the facility is well-protected and meets safety and quality requirements.
2.6. Infrastructure construction
Constructing the infrastructure system around the factory includes: drainage systems, access roads, yards, warehouses, storage areas, etc. These infrastructure items are intended to ensure that the transportation of goods and production and work activities at the factory take place most conveniently.
2.7. Technical system installation
In the next step of the factory construction process, the construction unit will install technical systems for the factory such as: electrical systems, water supply, drainage systems, waste treatment systems, fire protection systems, communication systems, etc. These technical systems will ensure the factory operates as smoothly and efficiently as possible.
2.8. Finishing and equipment installation
After major construction steps such as the steel frame, roof, and walls are completed, the next stage in the factory construction process is finishing and installing equipment and machinery. This is a crucial stage to ensure the factory is ready for operation, meeting production requirements and long-term functionality.
2.9. Cleaning and commissioning
After completing the above stages, the construction team will clean the entire factory area one last time before putting it into operation. After ensuring everything is installed correctly and there are no technical errors, the construction unit will hand over the project to the investor.
In addition to cleaning and inspection upon completion, the contractor must also perform regular warranty, maintenance, and upkeep tasks for the project. This will ensure the project operates most efficiently and durably over time.
Are you looking for a reputable and professional factory and warehouse construction contractor? Please contact Hai Long Construction for consultation and a quote:
- HAI LONG CONSTRUCTION JSC – MEMBER OF TAIYO GROUP
- Address: Taiyo Building, 97 Bach Dang, Ha Ly Ward, Hong Bang District, Hai Phong City, Vietnam.
- Hotline: 084 6625 888
- Email: info@hailongjsc.vn